Reedbed Case Study
Reedbed Project Ashbourne, England
Clean-out of Reedbed
Clean-out of single reedbed to maintain the efficacy of single-bed water treatment system.
What work was required?
-
Installation of approx 300m of temporary trackway to gain access.
-
Removal of hedges to create access in a very difficult-to-access site.
-
Complete removal of existing growth and growing media.
-
Refurbishment and replacement of reed bed liner and growing media.
-
Replant of fresh reeds rather than transplanting.
-
All waste was recycled.
Construction and management of your project’s reedbed solutions.