Reedbed Case Study

Reedbed Project Ashbourne, England

Clean-out of Reedbed

Clean-out of single reedbed to maintain the efficacy of single-bed water treatment system.

Ashbourne-KirkIreton4-e1762174123545
20220330_125042_resized

What work was required?

  • Installation of approx 300m of temporary trackway to gain access.

  • Removal of hedges to create access in a very difficult-to-access site.

  • Complete removal of existing growth and growing media.

  • Refurbishment and replacement of reed bed liner and growing media.

  • Replant of fresh reeds rather than transplanting.

  • All waste was recycled.

Construction and management of your project’s reedbed solutions.