Reedbed Case Study
Reedbed Project East Lothian, Scotland
Clean-out of Reedbed
Clean-out of reedbed 1 to lower very high water levels across the 2-bed system.
What work was required?
- Construction of site security fencing, access trackway, and safety signage.
- Chopper pump and pipework.
- Construction of temporary sump and loading platform.
- Recovery and recycling of all tonnage removed.
- Transplanting of Phragmites australis and aftercare monitoring.
Construction and management of your project’s reedbed solutions.