Clean-out of Reedbed

Clean-out of reedbed 1 to lower very high water levels across the 2-bed system.

2024-11-20_21-44-42_000-1
Screenshot 2026-02-13 151316

What work was required?

  • Construction of site security fencing, access trackway, and safety signage.
  • Chopper pump and pipework.
  • Construction of temporary sump and loading platform.
  • Recovery and recycling of all tonnage removed.
  • Transplanting of Phragmites australis and aftercare monitoring.